Agent Overview

Rosa AI agent illustration

Rosa

TE, Run-Rate & Loss Accounting

Rosa is the performance truth agent for Manufacturing. It turns “we had a rough shift” into a clean TE story that operators, supervisors, and plant leaders can act on. Rosa standardizes run-rate targets by SKU and line, classifies losses (planned vs unplanned, speed loss, minor stops, quality holds, changeover loss, material starvation), and produces a tight narrative: what happened, why it happened, and what to do next. It doesn’t just calculate TE—it teaches it. The output is shift-ready: where minutes were lost, which losses were controllable, what changed versus normal, and which actions move throughput fastest. Built to support judgment, not replace it: your team owns the decisions, Rosa makes the performance data coherent, comparable, and operationally useful.

Primary Outputs

Typical deliverables
TE dashboards: TE by line/SKU/shift with standardized rate assumptions and comparable loss buckets
Loss accounting: categorized minutes with top drivers and controllable vs uncontrollable separation
Run-rate variance briefs: actual rate vs standard, with root driver hypotheses (equipment, staffing, material, settings)
Shift recap narratives: what happened, what changed, and the 3 actions most likely to recover throughput
Focus list: “top 5 losses to attack” by line with expected minutes back and the owner to close the loop
Standard work prompts: checks and routines tied to repeat losses (minor stops, changeover discipline, setpoints)

Core Capabilities

What it does
Standardizes TE math and run-rate targets by line/SKU so performance is comparable across time and teams
Classifies loss minutes cleanly (planned/unplanned, speed loss, minor stops, quality holds, changeovers, starvation)
Explains “why TE moved” with a clear driver narrative, not just charts and tables
Separates controllable vs uncontrollable losses so teams focus on the levers that actually move throughput
Surfaces repeat loss patterns by line/asset/shift and recommends standard work checks to prevent recurrence
Creates coaching-ready shift summaries that drive action, ownership, and follow-through

Operational Fit

How it’s used
Used By

Plant managers, production supervisors, CI/OpEx leaders, and line leads.

Used For

Daily direction setting, TE improvement, loss elimination prioritization, and shift performance coaching.

Typical Questions
  • What actually drove TE down (or up) this shift, and where did the minutes go?
  • Are we missing rate because of speed loss, micro-stops, changeovers, or downtime—and which is controllable?
  • What 3 actions will recover the most throughput fastest—and who owns each?